{"id":690,"date":"2021-12-06T21:31:51","date_gmt":"2021-12-06T21:31:51","guid":{"rendered":"https:\/\/moodle.localhost\/wp\/?page_id=690"},"modified":"2024-05-15T17:48:15","modified_gmt":"2024-05-15T17:48:15","slug":"pricing-and-ordering","status":"publish","type":"page","link":"https:\/\/metcomtech.com\/es\/pricing-and-ordering\/","title":{"rendered":"Precios de formaci\u00f3n"},"content":{"rendered":"<p><\/p>\n\n\n\n<figure class=\"wp-block-table\">\n<table style=\"background-color: #ffffff; border-collapse: collapse; width: 100%; height: 750px;\" cellpadding=\"10\">\n<thead>\n<tr style=\"height: 77px;\">\n<th class=\"has-text-align-left\" style=\"width: 63.4857%; height: 77px; background-color: #d8e8d5;\" data-align=\"left\"><span style=\"color: #000000;\"><span style=\"text-decoration: underline; color: #339966;\"><span class=\"has-inline-color\">Programas de formaci\u00f3n<\/span><\/span><br \/><strong><em><span class=\"has-inline-color has-black-color\"><sub>Todos los programas incluyen registro \u00fanico y tarifa de acceso en l\u00ednea de $215. <br \/>Los participantes ya inscritos podr\u00e1n deducir este importe.<\/sub><\/span><\/em><\/strong><\/span><\/th>\n<th style=\"width: 13.1876%; height: 77px; background-color: #d8e8d5;\"><br \/><span style=\"color: #000000;\">Horas<\/span><br \/><span style=\"color: #000000;\">estimadas<\/span><\/th>\n<th style=\"width: 12.9225%; height: 77px; background-color: #d8e8d5;\"><span style=\"color: #000000;\">Prerrequisitos\u00a0<\/span><\/th>\n<th style=\"width: 10.2717%; height: 77px; background-color: #d8e8d5;\"><span style=\"color: #000000;\">Precio<\/span><br \/><span style=\"color: #000000;\">(D\u00d3LAR ESTADOUNIDENSE)\u00a0<\/span><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"height: 51px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 51px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Programa completo de capacitaci\u00f3n en Metcom<\/strong> (M\u00f3dulos 1-22) Este programa incluye todos los m\u00f3dulos de formaci\u00f3n y cubre AG \/ SAG, molienda de bolas y molienda baras. <\/span><span style=\"color: #000000;\">configuraciones.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 51px;\"><span style=\"color: #000000;\">64<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 51px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 51px;\"><span style=\"color: #000000;\">$4,435<\/span><\/td>\n<\/tr>\n<tr style=\"height: 77px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 77px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Programa de formaci\u00f3n sobre eficiencia del sistema de clasificaci\u00f3n (CSE)<\/strong><\/span><br \/><span style=\"color: #000000;\">(m\u00f3dulos 5, 7, 8, 9, 18) Este programa proporciona todos los pasos para calcular y aumentar la eficiencia del sistema de Clasificaci\u00f3n (CSE) de circuitos de molienda con bolas.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 77px;\"><span style=\"color: #000000;\">16<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 77px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 77px;\"><span style=\"color: #000000;\">$1,439<\/span><\/td>\n<\/tr>\n<tr style=\"height: 103px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 103px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Evaluaci\u00f3n de molienda aut\u00f3gena y semiaut\u00f3gena (SAG)<\/strong><\/span><br \/><span style=\"color: #000000;\">(M\u00f3dulo 22) Este programa de un solo m\u00f3dulo proporciona conocimientos y habilidades esenciales para gestionar eficazmente el rendimiento del procesamiento de circuitos AG\/SAG. Incluye tres prefacios que abordan el consumo de energ\u00eda del molino (S)AG, las mediciones de potencia y nivel de carga de (S)AG y el an\u00e1lisis del \u00edndice de trabajo del molino de bolas (S)AG.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 103px;\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 103px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 103px;\"><span style=\"color: #000000;\">$499<\/span><\/td>\n<\/tr>\n<tr style=\"height: 77px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 77px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Programa de bombeo de pulpa<\/strong><\/span><br \/><span style=\"color: #000000;\">(M\u00f3dulo 9) Este programa de un solo m\u00f3dulo cubre los sistemas de bombeo de lodo, lo que le permite caracterizar el rendimiento de la bomba de lodo y realizar ajustes para lograr el rendimiento deseado.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 77px;\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 77px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 77px;\"><span style=\"color: #000000;\">$499<\/span><\/td>\n<\/tr>\n<tr style=\"height: 77px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 77px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Medidas de eficiencia de molienda industrial<\/strong>\u00a0(M\u00f3dulos 4, 5) Este programa de dos m\u00f3dulos aborda los c\u00e1lculos del \u00edndice de trabajo para evaluar la eficiencia del circuito de molienda, as\u00ed como el an\u00e1lisis de rendimiento funcional de los circuitos de molinos de bolas.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 77px;\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 77px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 77px;\"><span style=\"color: #000000;\">$649<\/span><\/td>\n<\/tr>\n<tr style=\"height: 77px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 77px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Rendimiento funcional de los circuitos de molienda de bolas<\/strong><\/span><br \/><span style=\"color: #000000;\">(M\u00f3dulo 5) En este programa de un m\u00f3dulo, usted aprender\u00e1 c\u00f3mo caracterizar el comportamiento de los circuitos de molinos de bolas usando la ecuaci\u00f3n de rendimiento funcional.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 77px;\"><span style=\"color: #000000;\">2.5<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 77px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 77px;\"><span style=\"color: #000000;\">$429<\/span><\/td>\n<\/tr>\n<tr style=\"height: 82px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 82px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>C\u00e1lculos de balance de masa y programa inform\u00e1tico<\/strong><\/span><br \/><span style=\"color: #000000;\">(M\u00f3dulo 16, incluye programa de balance de masa) Con este programa, podr\u00e1 calcular el balance de masa de circuitos de molienda cerrados. Este programa requiere Microsoft Excel<sup>tm<\/sup>\u00a0.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 82px;\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 82px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 82px;\"><span style=\"color: #000000;\">$875<\/span><\/td>\n<\/tr>\n<tr style=\"height: 129px;\">\n<td class=\"has-text-align-left\" style=\"width: 63.4857%; height: 129px;\" data-align=\"left\"><span style=\"color: #000000;\"><strong>Programa metal\u00fargico gerente<\/strong><\/span><br \/><span style=\"color: #000000;\">(M\u00f3dulos 1, 4, 5, 6, 21, 22) Este programa de formaci\u00f3n est\u00e1 dise\u00f1ado para responsables de planta implicados en el circuito de molienda. Aborda temas clave para ayudar al personal administrativo con decisiones relacionadas con la mejora del proceso de molienda. Esto incluye: Introducci\u00f3n al sistema Metcom, \u00edndice de eficiencia de trabajo, an\u00e1lisis de desempe\u00f1o funcional, econom\u00eda de la planta, control de molienda y evaluaci\u00f3n de molienda (S)AG.<\/span><\/td>\n<td style=\"text-align: center; width: 13.1876%; height: 129px;\"><span style=\"color: #000000;\">15.75<\/span><\/td>\n<td style=\"text-align: center; width: 12.9225%; height: 129px;\"><span style=\"color: #000000;\">no<\/span><\/td>\n<td style=\"width: 10.2717%; text-align: center; height: 129px;\"><span style=\"color: #000000;\">$1385<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><\/p>\n\n\n\n<table id=\"tablepress-5\" class=\"tablepress tablepress-id-5\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\"><strong>M\u00f3dulos de formaci\u00f3n individual<\/strong><\/th><th class=\"column-2\">Horas<br \/>\nestimadas<\/th><th class=\"column-3\">M\u00f3dulos Prerrequisitos<\/th><th class=\"column-4\">CEU*<\/th><th class=\"column-5\">Precio<br \/>\n($US)<\/th><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\"><strong>Cuota de inscripci\u00f3n:<\/strong> (Obligatorio para toda la capacitaci\u00f3n en l\u00ednea, v\u00e1lido por 12 meses) Se debe pagar una tarifa de inscripci\u00f3n \u00fanica para el acceso en l\u00ednea a todos los materiales de capacitaci\u00f3n. Las credenciales de inicio de sesi\u00f3n son v\u00e1lidas durante 12 meses, despu\u00e9s de los cuales se requiere una tarifa de renovaci\u00f3n de acceso en l\u00ednea de $195\/a\u00f1o para mantener el acceso.<\/td><td class=\"column-2\">-<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">$215<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\"><strong>Gu\u00eda del participante<\/strong>: Incluida con toda la formaci\u00f3n, esta gu\u00eda describe las principales caracter\u00edsticas del Programa y brinda informaci\u00f3n sobre sus planes de estudio futuros, certificaci\u00f3n, derechos de autor y otros temas importantes. Se incluye una lista general de todas las referencias t\u00e9cnicas enumeradas en los m\u00f3dulos junto con un glosario general de palabras y expresiones clave.<\/td><td class=\"column-2\">0.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.1<\/td><td class=\"column-5\">$0<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\"><strong>gu\u00eda de documentaci\u00f3n<\/strong>: Esta gu\u00eda de documentaci\u00f3n le ayudar\u00e1 a organizar toda la informaci\u00f3n y los datos que se utilizar\u00e1n para aplicar el sistema Metcom a sus circuitos de rectificado.<\/td><td class=\"column-2\">0.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">$76<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 1- Introducci\u00f3n al Sistema Metcom<\/strong> Este m\u00f3dulo le presentar\u00e1 el sistema Metcom. Explica las razones t\u00e9cnicas y econ\u00f3micas para aplicar el Sistema Metcom a las operaciones de molienda de plantas.<\/td><td class=\"column-2\">0.75<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.1<\/td><td class=\"column-5\">$76<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 2- Demanda de Potencia en Molinos:<\/strong> Este m\u00f3dulo proporciona instrucciones detalladas para determinar las caracter\u00edsticas y capacidades de consumo de energ\u00eda del molino para molinos de barras, bolas y AG \/ SAG.<\/td><td class=\"column-2\">2.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 3- de Potencia y Nivel de Carga: <\/strong>En este m\u00f3dulo, aprender\u00e1 a medir el consumo de energ\u00eda y la carga volum\u00e9trica de sus molinos a partir de lecturas y mediciones de la planta.<\/td><td class=\"column-2\">2.50<\/td><td class=\"column-3\">2<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 4 - Eficiencia en el \u00cdndice de Trabajo: <\/strong>En este m\u00f3dulo, aprender\u00e1 sobre los c\u00e1lculos del \u00edndice de trabajo para evaluar la eficiencia del circuito de molienda, como los desarroll\u00f3 inicialmente el Sr. Fred Bond.<\/td><td class=\"column-2\">3.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.4<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 5 - Rendimiento Funcional de Molienda de Bolas:<\/strong> En este m\u00f3dulo, aprender\u00e1 a caracterizar el rendimiento de los circuitos de molinos de bolas utilizando la Ecuaci\u00f3n de rendimiento funcional.<\/td><td class=\"column-2\">2.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 6 - Molienda y Econom\u00eda de la Planta: <\/strong>En este m\u00f3dulo, aprender\u00e1 c\u00f3mo relacionar la eficiencia de molienda con los costos de molienda y calcular\u00e1 el valor del producto del circuito de molienda en su planta. Podr\u00e1 evaluar los efectos de los cambios en el tonelaje y la molienda de la planta, y evaluar diferentes formas de aprovechar las mejoras en la eficiencia de la molienda.<\/td><td class=\"column-2\">3.00<\/td><td class=\"column-3\">1<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 7-  Rendimiento del Hidrociclon:<\/strong> En este m\u00f3dulo, aprender\u00e1 sobre el hidrocicl\u00f3n y c\u00f3mo caracterizar el desempe\u00f1o del hidrocicl\u00f3n.<\/td><td class=\"column-2\">3.00<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 8 - Ajustes del Hidrociclon: <\/strong>Este m\u00f3dulo le presenta un m\u00e9todo sistem\u00e1tico mediante el cual puede lograr el rendimiento de hidrocicl\u00f3n deseado.<\/td><td class=\"column-2\">4.00<\/td><td class=\"column-3\">7<\/td><td class=\"column-4\">0.5<\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 9 - Bombeo de Pulpa: <\/strong>En este m\u00f3dulo se familiarizar\u00e1 con los sistemas de bombeo de pulpa, c\u00f3mo caracterizar el rendimiento de la bomba de pulpa y c\u00f3mo realizar ajustes para lograr el rendimiento deseado.<\/td><td class=\"column-2\">4.00<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.5<\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo10 - Datos Existentes y Datos Requeridos:<\/strong> En este m\u00f3dulo, encontrar\u00e1 un resumen de la informaci\u00f3n existente y requerida que necesita sobre el circuito de molienda en su planta para lograr mejoras en el rendimiento de molienda. En particular, aprender\u00e1 c\u00f3mo recopilar datos existentes relevantes sobre circuitos de molienda e identificar los datos requeridos de los estudios de circuitos de molienda.<\/td><td class=\"column-2\">1.00<\/td><td class=\"column-3\">1<\/td><td class=\"column-4\">0.1<\/td><td class=\"column-5\">$76<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo11 - Gu\u00eda de Muestreo en la Planta y Estudio de Circuitos: <\/strong>En este m\u00f3dulo, aprender\u00e1 a dise\u00f1ar y ejecutar estudios de circuitos de molienda en su planta para cumplir con los requisitos del sistema Metcom.<\/td><td class=\"column-2\">2.00<\/td><td class=\"column-3\">  1, 10<\/td><td class=\"column-4\">0.2<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 12 -  An\u00e1lisis y Manejo de Muestreo:<\/strong> En este m\u00f3dulo, aprender\u00e1 a manipular y analizar muestras de minerales y pulpa.<\/td><td class=\"column-2\">3.50<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\">0.4<\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 13 - Introducci\u00f3n a las Pruebas de Molibilidad: <\/strong>El objetivo de este m\u00f3dulo es presentarle las pruebas de molienda. Aprender\u00e1 a seleccionar la prueba adecuada para sus necesidades.<\/td><td class=\"column-2\">1.00<\/td><td class=\"column-3\">1<\/td><td class=\"column-4\">0.1<\/td><td class=\"column-5\">$76<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 14 - Pruebas de Molibilidad de Bond:<\/strong> El objetivo de este m\u00f3dulo es que pueda realizar pruebas de molienda de molino de barras Bond y molino de bolas.<\/td><td class=\"column-2\">2.50<\/td><td class=\"column-3\">12<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 15 - Pruebas de Molibilidad en Lote:<\/strong> En este m\u00f3dulo, aprender\u00e1 a dise\u00f1ar y realizar pruebas de molienda por lotes en el sitio.<\/td><td class=\"column-2\">3.50<\/td><td class=\"column-3\">  12, 13<\/td><td class=\"column-4\">0.4<\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 16 - C\u00e1lculos de Balance en Masa: <\/strong>En este m\u00f3dulo, aprender\u00e1 c\u00f3mo balancear la masa de los datos de la encuesta del circuito de molienda utilizando el programa inform\u00e1tico Metcom Mass Balance que se incluye con el m\u00f3dulo.<\/td><td class=\"column-2\">1.00<\/td><td class=\"column-3\">11<\/td><td class=\"column-4\">0.1<\/td><td class=\"column-5\">$659<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 17 - Evaluaci\u00f3n de Molienda de Barra: <\/strong>Al completar este m\u00f3dulo, podr\u00e1 evaluar el dise\u00f1o del circuito del molino de barras existente y alternativo y las variables operativas en t\u00e9rminos de sus efectos sobre la eficiencia de molienda del molino de barras.<\/td><td class=\"column-2\">2.00<\/td><td class=\"column-3\">  3, 4, 6 , 11<\/td><td class=\"column-4\">0.2<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 18 - Evaluaci\u00f3n del Circuito de Clasificaci\u00f3n: <\/strong>Una vez que haya completado este m\u00f3dulo, podr\u00e1 evaluar el dise\u00f1o del circuito de molino de bolas existente y alternativo y las variables operativas en t\u00e9rminos de sus efectos sobre la eficiencia del sistema de clasificaci\u00f3n de un circuito de molino de bolas.<\/td><td class=\"column-2\">2.50<\/td><td class=\"column-3\">  5, 6, 8<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\">$219<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 19 - Evaluaci\u00f3n de la Molienda del Molino de Bolas: <\/strong>En este m\u00f3dulo, aprender\u00e1 a evaluar el dise\u00f1o del circuito del molino de bolas existente y alternativo y las variables operativas en t\u00e9rminos de sus efectos sobre la eficiencia de molienda del molino de bolas.<\/td><td class=\"column-2\">2.00<\/td><td class=\"column-3\">  1, 2 , 5, 6, 8, 18<\/td><td class=\"column-4\">0.2<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 20 -  Evaluaci\u00f3n de la Disposici\u00f3n de Circuitos: <\/strong>Una vez que haya completado este m\u00f3dulo, podr\u00e1 evaluar los arreglos existentes y alternativos del circuito de molienda en t\u00e9rminos de su efecto sobre la eficiencia del circuito de molienda.<\/td><td class=\"column-2\">4.00<\/td><td class=\"column-3\">1, 2, 4, 5, 6,<br \/>\n 17, 18, 19<\/td><td class=\"column-4\">0.5<\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 21 - Control del Circuito de Molienda:  <\/strong>En este m\u00f3dulo aprender\u00e1 a definir los prop\u00f3sitos del control del proceso de molienda, identificar perturbaciones y acciones correctivas adecuadas, especificar un sistema de control y estimar los beneficios econ\u00f3micos de un control mejorado.<\/td><td class=\"column-2\">2.00<\/td><td class=\"column-3\">1, 5, 6, 7, 8<\/td><td class=\"column-4\">0.2<\/td><td class=\"column-5\">$153<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\"><strong>M\u00f3dulo 22- Evaluaci\u00f3n de la Molienda Aut\u00f3gena y Semi-Autogena:<\/strong> Desarrollado para el personal de la planta metal\u00fargica y la gesti\u00f3n de las operaciones, as\u00ed como aquellos que los apoyan (por ejemplo, los departamentos t\u00e9cnicos y proveedores). Este m\u00f3dulo proporciona los conocimientos esenciales y un conjunto de habilidades para gestionar con eficacia AG \/ SAG<\/td><td class=\"column-2\">4.00**<\/td><td class=\"column-3\">no<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">$285<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\"><\/td><td class=\"column-2\"><\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\"><strong>Tarifas de inscripci\u00f3n<\/strong><\/td><td class=\"column-2\"><\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">Obligatorio para todos los nuevos aprendices de Metcom que se registren para los m\u00f3dulos de formaci\u00f3n individual. Esta tarifa \u00fanica es para la configuraci\u00f3n de la cuenta y para el acceso en l\u00ednea a todos los materiales de formaci\u00f3n. Las credenciales de inicio de sesi\u00f3n son v\u00e1lidas durante 12 meses, despu\u00e9s de lo cual se requiere una tarifa de renovaci\u00f3n de acceso en l\u00ednea de $95\/a\u00f1o para mantener el acceso.<\/td><td class=\"column-2\"><\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">$215<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">Tarifa de renovaci\u00f3n de acceso en l\u00ednea (12 meses) Se requiere para mantener el acceso a los materiales de capacitaci\u00f3n en l\u00ednea despu\u00e9s del acceso inicial de 12 meses incluido en la tarifa de registro.<\/td><td class=\"column-2\"><\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">$195<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td><td class=\"column-8\"><\/td><td class=\"column-9\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n\n\n\n<p><table style=\"border-collapse: collapse; width: 0%; height: 190px;\">\n<tbody>\n<tr style=\"height: 23px;\">\n<td style=\"width: 50%; height: 23px;\" colspan=\"2\">\u00a0<\/td>\n<td style=\"width: 25%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 76.9231%; height: 23px;\">\u00a0<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25.1967%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 24.8033%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 25%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 76.9231%; height: 23px;\">\u00a0<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25.1967%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 24.8033%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 25%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 76.9231%; height: 23px;\">\u00a0<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25.1967%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 24.8033%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 25%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 76.9231%; height: 23px;\">\u00a0<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25.1967%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 24.8033%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 25%; height: 23px;\">\u00a0<\/td>\n<td style=\"width: 76.9231%; height: 23px;\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/p><\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>","protected":false},"excerpt":{"rendered":"<p>Training ProgramsAll programs Include one-time registration and online access fee of $215. Participants\u00a0 already enrolled can deduct this amount. EstimatedHours Prerequisites\u00a0 Price(USD)\u00a0 Complete Metcom Training Program (Modules 1-22) This program includes all training modules and covers various types of grinding circuit configurations. 64 none $4,435 Classification System Efficiency (CSE) Training Program(Modules 5, 7, 8 ,9, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"wp-custom-template-a1-main-template","meta":{"footnotes":""},"class_list":["post-690","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/pages\/690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/comments?post=690"}],"version-history":[{"count":65,"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/pages\/690\/revisions"}],"predecessor-version":[{"id":2961,"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/pages\/690\/revisions\/2961"}],"wp:attachment":[{"href":"https:\/\/metcomtech.com\/es\/wp-json\/wp\/v2\/media?parent=690"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}